Jinan City’s “Several Provisions on Strengthening Quality Management of Exterior Wall Thermal Insulation Construction”


Release Date:

2019-12-17

Information Summary:

Jinan City’s “Several Provisions on Strengthening Quality Management of Exterior Wall Thermal Insulation Construction”

 Binzhou Hongji Building Materials Co., Ltd.

Notice of the Jinan Municipal Urban–Rural Construction Commission on Issuing the “Several Provisions on Strengthening Quality Management in the Construction of Exterior Wall Thermal Insulation Works”

To the Construction Committees (Bureaus) of all counties and districts, the Land and Planning Construction Administration of the High-tech Zone, the Planning and Development Bureau of the Southern Mountainous Area Management Committee, and all relevant units:

The “Several Provisions on Strengthening Quality Management of Exterior Wall Thermal Insulation Construction” are hereby issued to you; please comply accordingly.

Jinan Municipal Urban and Rural Construction Committee

August 1, 2018

 

Several Provisions on Strengthening Quality Management of Exterior Wall Thermal Insulation Construction Projects

Chapter 1 General Provisions

Article 1: In order to strengthen quality management of exterior wall insulation construction and effectively prevent potential quality hazards such as detachment and water leakage, these Regulations are hereby formulated in accordance with relevant laws, regulations, and technical standards, and taking into account the actual conditions of our city.

Article 2: Any entity engaged in the construction of exterior wall insulation systems for new buildings, as well as related supervisory and administrative activities, within the administrative area of this municipality shall comply with these Provisions.

Article 3 This Regulation primarily applies to exterior wall insulation systems that employ externally bonded insulation boards and thin‑coat plaster, including polystyrene board thin‑coat plaster exterior wall insulation systems, rock wool board thin‑coat plaster exterior wall insulation systems, and others.

With respect to integrated exterior wall insulation systems that combine thermal insulation with the building’s exterior wall structure, non‑transparent curtain‑wall insulation systems, and insulated decorative panel exterior wall insulation systems, the relevant administrative and technical requirements shall be implemented in accordance with these provisions.

Article 4: The adoption of integrated exterior wall insulation systems that combine thermal insulation with the building’s exterior wall structure is encouraged.

Article 5: The entities responsible for construction quality, including developers, contractors, and supervisory units, shall bear legal responsibility for the construction quality of exterior wall insulation projects. Suppliers of exterior wall insulation systems shall be responsible for the quality of the systems and materials they provide, and quality inspection agencies shall be responsible for the accuracy and reliability of the inspection reports they issue.

In addition to strictly complying with these Regulations, the aforementioned responsible entities and units shall also comply with the relevant provisions on building energy‑saving supervision.

Chapter 2: General Provisions

Article 6: The project owner shall incorporate the exterior wall insulation works into the general construction contracting management and bear primary responsibility for the quality of such works. The project owner shall not subcontract the exterior wall insulation works in a fragmented manner. The general contractor shall strengthen training and education to enhance the operational skills of personnel engaged in the execution of exterior wall insulation works.

Article 7: The design depth of the construction drawing documents for exterior wall insulation projects shall comply with relevant national regulations. For key areas and critical nodes that affect safety and essential functional performance, specific construction methods and associated technical measures must be clearly defined.

The project owner shall not arbitrarily alter the exterior wall insulation construction drawings that have been reviewed and approved. If changes are indeed necessary, they must be documented in accordance with the prescribed procedures; any modifications that affect safety or other critical aspects shall be subject to approval by the original drawing review authority.

Article 8: Exterior wall insulation systems shall be accompanied by a valid “Shandong Province Certificate of Recognition for New Wall Material Building Energy-Saving Technology Products” (hereinafter referred to as the “Certificate of Recognition”) and a type‑test report.

The structure of the exterior wall insulation system and the types of its constituent materials must be consistent with the contents of the approval certificate and the type‑test report; all components of the system must be supplied as a matched set by the system supplier.

Article 9: During the construction of exterior wall insulation works and within 24 hours after completion, the temperature of the substrate and the ambient air shall not be lower than 5°C. In summer, direct sunlight exposure should be avoided. Construction shall not be carried out in winds of Force 5 or higher, nor during rainy or snowy weather.

Article 10: For new technologies and materials used in exterior wall insulation projects for which no national or local standards currently exist, the project owner shall convene relevant experts to conduct a specialized review of their suitability, key technical quality‑control measures, acceptance criteria, and other pertinent aspects.

Chapter 3: Construction Preparation

Article 11. Prior to the commencement of exterior wall insulation works, the project owner shall convene the design firm, the supervision unit, the general contractor (including specialized subcontractors), and the system supplier, among others, to conduct a special review of the construction drawing design documents and prepare minutes of the review. For key areas and critical nodes involving safety or essential functional requirements where specific implementation methods and related technical measures remain unclear, supplementary detailed design documents shall be prepared and submitted.

Article 12: Upon completion of the special joint review, the general contractor (or specialized subcontractor) shall, based on the construction drawing design documents, the minutes of the joint review, relevant technical standards, material and product instruction manuals, expert appraisal opinions, and other pertinent materials, prepare a specialized construction plan and submit it to the supervision unit for review and approval.

If a specialized construction plan exhibits obvious signs of template‑based copying, contains superficial content, and lacks specificity and operability, the supervising unit shall not approve it upon review.

Article 13: Upon the arrival of each component material for the exterior wall insulation system, the general contractor shall, following self‑inspection and confirmation of compliance, promptly submit a request for inspection to the supervising unit. The supervising unit shall conduct incoming‑material acceptance in accordance with the following requirements:

1. Based on the certification certificate and the type‑test report, verify whether each component material of the system is supplied as a matched set by the system supplier, and confirm that the system configuration and material types are consistent with the contents of the certification certificate and the type‑test report.

2. Verify that all quality certification documents for the system’s constituent materials are complete and valid, and conduct visual inspection and acceptance of their appearance.

3. For materials that require re‑inspection upon arrival—such as insulation boards, adhesives, finishing plaster mortars, and alkali‑resistant fiberglass mesh—the samples must be randomly selected from the materials already on site. After the samples are sealed in the presence of authorized representatives from the project owner, contractor, supervisory unit, and quality‑inspection agency, they shall be submitted for testing.

Materials that have not undergone site acceptance or have failed site acceptance shall be strictly prohibited from being used in the project.

Article 14: Prior to large-scale construction of exterior wall insulation works, the general contractor (or specialized subcontractor) shall fabricate a sample wall on the actual project using the same materials and construction methods. The sample wall shall meet the following requirements:

1. It shall be prepared on a per‑project (lot) basis; if multiple exterior wall insulation systems are employed within the same project (lot), separate submissions shall be prepared for each system.

2. It shall be located at the corner where the gable wall meets the exterior longitudinal wall, with an area of no less than 20 m², and shall include at least one exterior window opening and one projecting element of the exterior wall.

3. Signage shall be provided to display, on a layer-by-layer basis, the types of materials used in each structural layer of the exterior wall insulation system.

4. Signage shall be provided to illustrate, in both text and graphics, the methods for applying insulation boards and the required bond area, as well as the procedures for anchor bolt installation and the specified anchorage depths.

While fabricating the reference wall, corresponding test specimens shall be prepared to assess the bond strength between the insulation boards and the substrate, as well as the anchorage capacity of the anchors, and on-site pull-out tests shall be commissioned to a qualified testing agency.

Upon completion of the sample wall and passing the on-site pull-out test, the project owner shall organize the supervisory unit, the general contractor (including specialized subcontractors), the system supplier, and other relevant parties to conduct a joint acceptance inspection and prepare an acceptance record (the format of which is provided in the appendix). Only after the joint acceptance is approved may large-scale construction proceed.

Article 15: Prior to commencing large-scale exterior wall insulation work, the project technical manager of the general contractor shall, in accordance with the specialized construction plan and based on the physical sample wall, conduct a technical briefing for all construction personnel and maintain written and visual records of the briefing.

Chapter 4 Construction, Acceptance, and Testing

Article 16 Prior to the application of exterior wall insulation boards, the exterior wall substrate shall be prepared in accordance with the following requirements:

1. All types of construction openings on exterior walls—including, but not limited to, wall‑penetrating bolt holes, cantilevered steel supports for scaffolding, and temporary openings reserved for wall‑connecting components—shall be tightly sealed and provided with waterproofing on the water‑facing side. Additionally, the internal corners of all projecting exterior wall elements shall be waterproofed. The type of waterproofing material and the specific application method shall comply with the design requirements; cement‑based crystalline waterproofing coatings are recommended.

2. A polymer-modified mortar shall be used to achieve overall leveling of the substrate wall surface. The leveling layer must exhibit strong adhesion, with a smooth and clean surface; the deviation in surface flatness shall not exceed 5 mm.

It is strictly prohibited to directly adhere insulation boards to untreated substrate walls to prevent exterior wall leakage or inadequate adhesion caused by uneven substrate surfaces.

Article 17: In the installation of exterior wall insulation boards, in addition to strict compliance with applicable current national and local technical standards, the following requirements shall also be met:

1. Prior to installation, both XPS boards and rock wool boards must undergo surface treatment: for XPS boards, the two large faces should be sprayed with a dedicated interface agent; for rock wool boards, both the two large faces and the four smaller faces should be sprayed with a water‑resistant interface agent.

2. When preparing the adhesive for bonding insulation boards on site, strictly adhere to the dosage instructions provided in the product’s manual and use it within the specified time frame; do not add water a second time to remix the mixture.

3. For EPS/XPS boards, either the spot‑and‑frame method or the strip‑bonding method shall be used; the bond area on gable ends shall not be less than 60%, and on other areas shall not be less than 40%.

For rock wool boards, the gable areas shall be bonded using a full-bonding method without air gaps; other areas may use a strip-bonding method, with a bonding area of no less than 60%.

The spot-bonding method for attaching insulation boards is strictly prohibited to prevent back-side gaps from connecting and thereby amplifying wind‑load effects. For rock wool boards, additional support shall be provided by metal brackets, with the specifications, quantity, and placement of these brackets conforming to the design requirements.

4. At the corners of window openings, the insulation boards shall be cut from whole panels and must not be joined by splicing; at both ends of expansion joints, insulation boards must be properly filled in accordance with design requirements.

5. To prevent rainwater and meltwater from infiltrating between the insulation board and the substrate and causing frost heave, waterproof sealing shall be applied to critical junctions and terminations of the system, including the baseboard, expansion joints, exterior wall openings, and the top of parapet walls.

Article 18: In the construction of plastering mortar and anchor bolt installation for exterior wall insulation boards, in addition to strict compliance with applicable current national and local technical standards, the following requirements shall also be met:

1. When preparing the finishing mortar on site, strictly adhere to the dosage requirements specified in the product’s instructions for use and apply it within the prescribed time limit; do not add water and remix the mixture a second time.

For EPS/XPS boards, the finish coat mortar layer shall be applied in two passes. During the first pass, a layer of alkali‑resistant fiberglass mesh shall be embedded. At the junction between the firebreak strip and the insulation board, an additional layer of alkali‑resistant fiberglass mesh shall be installed during the second pass of the finish coat mortar (with an overlap of no less than 200 mm both vertically and horizontally).

For rock wool boards, the skim coat mortar layer shall be applied in three passes, with a layer of alkali-resistant fiberglass mesh embedded during the application of both the first and second skim coat layers.

At the system’s starting and terminating points—such as the baseboard, expansion joints, exterior wall openings, and the top of parapets—alkali‑resistant fiberglass mesh shall be used for edge wrapping. At internal and external corners, corner mesh shall be applied for reinforcement, thereby preventing cracking caused by stress concentration in the finishing mortar and guarding against the infiltration of rainwater and meltwater.

2. The number of anchor bolts shall comply with the design specifications and relevant standards. Anchor bolts shall be installed at the four corners of the insulation board and at the midpoints of horizontal joints, with longitudinal spacing not exceeding 300 mm and transverse spacing not exceeding 400 mm, arranged in a staggered (quincunx) pattern. At wall‑corner locations, the spacing shall not exceed 200 mm, and at least three anchor bolts shall be provided on each side of window openings.

The effective embedment depth of anchor bolts shall comply with the design specifications and relevant standards, being no less than 35 mm in concrete walls and no less than 60 mm in masonry walls.

For EPS/XPS boards, the diameter of the anchor bolt’s plastic disc shall not be less than 50 mm; for rock wool boards, the diameter of the anchor bolt’s plastic disc shall not be less than 140 mm.

Anchor bolt installation shall be carried out after the first layer of finishing plaster mortar (including the alkali‑resistant fiberglass mesh) has been applied. Drilling and installation must strictly comply with the manufacturer’s instructions; hammer‑driven insertion is prohibited. During drilling, the drill bit diameter must match the plastic expansion sleeve diameter, and the hole depth shall exceed the anchorage depth by 5–10 mm. Dust within the holes must be promptly and thoroughly removed.

Article 19: During the installation of exterior wall insulation boards, the application of skim coat mortar, and the installation of anchor bolts, the general contractor (or specialized subcontractor) shall conduct self-inspections and inter‑process handover inspections in strict accordance with these Regulations and relevant technical standards. The supervision unit shall carry out inspection and acceptance of critical construction stages in accordance with the following requirements:

1. Each inspection batch shall undergo rigorous concealed‑work acceptance inspections, with photographic documentation attached. The scope of the concealed‑work acceptance includes: exterior wall substrate waterproofing and overall leveling; treatment of the interface between insulation boards and the substrate; the method of bonding insulation boards and the bond area ratio; installation of alkali‑resistant fiberglass mesh; as well as the specifications, placement, and effective anchorage depth of anchor fasteners.

2. Upon completion of each inspection batch, at least three representative insulation boards shall be randomly exposed for inspection to verify the bonding method, bond area ratio, and effective anchorage depth of the anchors, and written and photographic records of the inspection shall be prepared.

For inspection items such as the adhesive method for insulation boards, the bond area ratio, and the effective anchorage depth of anchor bolts, if even one item fails to meet the requirements, the corresponding inspection location shall be deemed non‑conforming.

For the three inspection locations subject to random exposure inspection, if two or more are found non‑conforming, the inspection lot is deemed non‑conforming. If only one location is non‑conforming, an additional six locations shall be randomly selected for inspection; if one or more of these six remain non‑conforming, the inspection lot is deemed non‑conforming. However, if all six of the additional locations are conforming, the inspection lot is deemed conforming, and the non‑conforming locations identified in the initial inspection must undergo rework.

For items that fail inspection, the relevant supervision documents shall be issued immediately, and the general contractor (or specialized subcontractor) shall be ordered to rework and redo the work, followed by a re‑inspection and acceptance.

If the general contractor (or specialized subcontractor) refuses to make corrections, it shall promptly report the matter to the project owner and the engineering quality supervision authority.

Article 20: Upon completion of the exterior wall insulation finishing layer, the project owner shall commission a qualified quality‑inspection agency to conduct on‑site pull‑out tests to verify the bond strength between the insulation boards and the substrate, as well as the anchorage capacity of the anchors.

1. For on-site pull-out tests of the bond strength between insulation boards and the substrate, each project shall conduct at least one test group for each type of substrate wall, with no fewer than five measurement points per group.

2. For on-site pull-out tests of anchor bolt anchorage capacity, each unit project shall be divided into test batches based on every three floors of exterior walls. When the total exterior wall area of a test batch does not exceed 1,000 m², three test points shall be randomly selected; when the area exceeds 1,000 m², one additional test point shall be added for every 500 m², with any fractional portion of 500 m² being counted as a full 500 m². The exterior wall area referred to in this clause is the sum of the orthogonal projections of all façade surfaces of the exterior walls on each floor, without deducting the areas occupied by exterior window openings.

When selecting measurement points within a test batch, at least one point shall be sampled for each type of base wall, and at least one point shall be sampled per floor. Measurement points on two adjacent floors must be located on different exterior wall faces.

3. Prior to on-site testing, the testing agency shall prepare a testing plan based on the engineering design documents, applicable standards and specifications, and the testing contract, and obtain approval from the agency’s technical director and confirmation from the commissioning party. The testing agency shall notify the supervisory authority of the testing schedule at least five working days in advance.

4. On-site measurement points shall be numbered and documented in a schematic diagram. The layout of measurement points and the testing procedures shall be recorded with photographic evidence. The supervision unit shall witness the tests in accordance with applicable regulations and promptly sign off on the measurement-point layout diagram and the original test records.

5. The testing organization shall file and retain, together with the original test records and test report, the test plan, the schematic diagram of measurement point layout, and the photographic records of the tests. The test report issued by the testing organization shall clearly indicate the measured values. Reports indicating non‑conformity shall be promptly submitted to the supervisory authority.

Article 21: For the on-site pull-out test of anchor bolt anchorage capacity in a unit project, all test points shall achieve a 100% pass rate.

When the pass rate is 90% or higher and the minimum value is not less than 85% of the design value, the design unit may conduct a re‑verification of the safety of the exterior wall insulation system. If the pass rate falls short of 90% or the minimum value does not reach 85% of the design value, a qualified assessment and testing agency shall be commissioned to perform a full‑scale safety evaluation of the entire exterior wall insulation system. Should the assessment indicate that reinforcement or remedial measures are required, the design unit shall issue corresponding recommendations. Upon completion of the rectification by the construction unit, the testing agency shall, in accordance with applicable regulations, re‑test the anchorage strength of the anchor bolts; only after passing this re‑testing may acceptance be organized.

Chapter 5: Supervision and Administration

Article 22: The engineering quality supervision authority shall, on a project‑by‑project (lot‑by‑lot) basis, conduct supervisory spot checks and random testing of the construction quality of exterior wall insulation works in accordance with the following requirements:

1. Conduct spot checks on sample walls for exterior wall insulation.

2. Conduct supervisory sampling inspections of the primary constituent materials of exterior wall insulation systems.

For large-scale development projects such as residential communities, a single set of samples shall be selected for testing, based on the same engineering project (contract section), the same thermal insulation system, and the same manufacturer. The supervisory sampling report may serve as a substitute for the on-site witnessed sampling and testing report.

3. Conduct supervisory sampling inspections of the anchorage force of exterior wall external thermal insulation anchors and the bond strength between the insulation boards and the substrate.

For large-scale development projects such as residential communities, one unit project shall be randomly selected for testing, based on the same engineering project (contract section) and the same specialized subcontractor responsible for exterior wall insulation. The specific number of units to be tested shall be in accordance with Article 20 of these Regulations. The supervisory sampling test report may serve as a substitute for the on-site physical inspection report.

Article 23: With respect to violations of these Regulations and relevant laws, regulations, and technical standards identified during supervisory spot checks or sampling inspections, the engineering quality supervision authority shall, as appropriate, impose one or more of the following measures: ordering rectification within a specified time limit, suspending work for rectification, requiring rework or redoing, conducting appraisal and testing, deducting integrity points, or referring the matter to the urban management enforcement authorities for administrative penalties.

Chapter VI Supplementary Provisions

Article 24: During the construction of exterior wall insulation works, as well as during inspection and acceptance, quality testing, and quality supervision, reliable measures must be implemented to ensure personal safety.

Article 25: Matters not covered by these Provisions shall be governed by the relevant current national and local laws, regulations, and technical standards.

Article 26 This Regulation shall enter into force on August 1, 2018, and shall be valid for a period of five years.

Attachment: Acceptance Record for the Sample Wall of the Building Exterior Insulation Project

 Binzhou Hongji Building Materials Co., Ltd.